Ships Nostalgia banner

barracouta

  1. Barracouta pipelay.png

    Barracouta pipelay.png

    a 450mm diameter gas pipeline and a 150mm diameter oil/LPG pipeline connect Barracouta platform to landfall and from there extend onshore for 24.5 & 30.6 km respectively to Esso's onshore processing facility at Longford. Ingram laid the subsea pipelines to designated beach tie-in points.
Top