Joined
·
308 Posts
BISCO Submarines when on the Sept Isles run, only bridge and aft accomodation above water.
On the Rievaulx did 3 trips Glasgow Sept Isles, 20 hours in Glasgow then 1Hr 50 minutes loading at Sept Isles. Followed by a trip to Port Elizabeth, 2 weeks loading by hand. least we got a run ashore.
On the Rievaulx did 3 trips Glasgow Sept Isles, 20 hours in Glasgow then 1Hr 50 minutes loading at Sept Isles. Followed by a trip to Port Elizabeth, 2 weeks loading by hand. least we got a run ashore.